---
title: Oxygen - Specwall
description: The gym and swimming pool areas of Property Alliance Group’s Oxygen development required works to start before the tower cranes had been removed and ahead of the building being made watertight – ideal conditions for a mould-resistant, quick-to-install product like Specwall which can be installed in all weather conditions. Using a blockwork alternative would have [&hellip;]
---

![Trigger](https://www.specwall.com/hubfs/raw_assets/public/Specwall_September2021/images/menu-grey.svg)

- [Español](https://www.specwall.com/es/case-studies/oxygen)
- [English](https://www.specwall.com/case-studies/oxygen/)
- [Română](https://www.specwall.com/ro/case-studies/oxygen)

 Español

[Instagram](https://www.instagram.com/specwall_/) [Twitter](https://twitter.com/specwall) [Linkedin](https://www.linkedin.com/company/specwall-alliance-ltd/%20window.lintrk('track',%20{%20conversion_id:%208012466%20});) [YouTube](https://youtube.com/@specwall)

![Trigger](https://www.specwall.com/hubfs/raw_assets/public/Specwall_September2021/images/menu-grey.svg)

- [Español](https://www.specwall.com/es/case-studies/oxygen)
- [English](https://www.specwall.com/case-studies/oxygen/)
- [Română](https://www.specwall.com/ro/case-studies/oxygen)

 Español

[Instagram](https://www.instagram.com/specwall_/) [Twitter](https://twitter.com/specwall) [Linkedin](https://www.linkedin.com/company/specwall-alliance-ltd/%20window.lintrk('track',%20{%20conversion_id:%208012466%20});) [YouTube](https://youtube.com/@specwall)

[![Specwall](https://www.specwall.com/hubfs/raw_assets/public/Specwall_September2021/images/specwall-mono-logo.svg "Specwall")](https://www.specwall.com/?hsLang=es)

[info@specwall.com](mailto:info@specwall.com)  
[+44 (0) 161 511 4790](tel:01615114790)

St Mary's Parsonage,  
Manchester M3 2PN

- [HOME](https://www.specwall.com)
- [advantages](https://www.specwall.com/product-advantages/)
- [SPECIFICATIONS](https://www.specwall.com/specifications/)
- [SPECSHAFT](https://www.specwall.com/specshaft-smokeshaft)
- [CASE STUDIES](https://www.specwall.com/case-studies/)
- [FOR ARCHITECTS](https://www.specwall.com/for-architects)
- [CPD](https://www.specwall.com/cpd)
- [FAQS](https://www.specwall.com/faq/)
- [THE TEAM](https://www.specwall.com/team/)
- [LATEST NEWS](https://news.specwall.com/news)
- [CONTACT US](https://www.specwall.com/contact/)

Reg No: 13383606  
**©2023 SPECWALL **

![UK Research & Innovation](https://www.specwall.com/hubfs/raw_assets/public/Specwall_September2021/images/ukri-logo.svg "UK Research & Innovation")

# Oxygen

![Property-Alliance-Group](https://www.specwall.com/hubfs/Property-Alliance-Group.jpg "Property-Alliance-Group")

### Localidad: Manchester, Reino Unido

Las zonas de gimnasio y piscina de Oxygen de la promotora de viviendas Property Alliance Group requerían que las obras se iniciaran antes de que se retiraran las grúas de la torre y antes de que el edificio se impermeabilizara, condiciones ideales para un producto resistente al moho y de rápida instalación como Specwall, que puede instalarse en cualquier condición meteorológica. El uso de una alternativa de mampostería habría requerido una gran cantidad de andamios en los muros de 6,2m de altura y habría duplicado el período de construcción. El uso de Specwall eliminó este problema y supuso un importante ahorro en el proyecto del cliente.

![Oxygen](https://www.specwall.com/hubfs/Specwall_September2021/Images/oxygen.jpg "Oxygen")

[![All Case Studies](https://hubspot-no-cache-eu1-prod.s3.amazonaws.com/cta/default/19678481/8eea1e00-a179-4346-ba02-7858fdb91239.png)](https://hubspot-cta-redirect-eu1-prod.s3.amazonaws.com/cta/redirect/19678481/8eea1e00-a179-4346-ba02-7858fdb91239)

St Mary's Parsonage,  
Manchester M3 2PN

[info@specwall.com](mailto:sales@specwall.com)  
+44 (0) 161 511 4790

Reg No:13383606  
©2023 SPECWALL 

[![UK Research & Innovation](https://www.specwall.com/hubfs/raw_assets/public/Specwall_September2021/images/ukri-logo-white.svg "UK Research & Innovation")](https://www.ukri.org/)